沃爾瑪驗廠須知內(nèi)容(一)
沃爾瑪驗廠須知內(nèi)容(一) 客戶驗廠資料驗廠必須準(zhǔn)備的應(yīng)對方法:沃爾瑪驗廠生產(chǎn)能力評估(四)
沃爾瑪FCCA驗廠生產(chǎn)能力評估概括
4.0 Process and Production Control工序和生產(chǎn)控制
4.0.1 Does factory PD study and apply product safety features, buates patterns, moulds, and samples during product design and development?
產(chǎn)品設(shè)計和開發(fā)部門是否在產(chǎn)品設(shè)計及開發(fā)過程中研究與應(yīng)用產(chǎn)品安全特性,評估樣式、模具和樣品?
4.0.2 Factory has documented Quality procedures (QP) at each stage of operation.
驗廠的工廠是否在每一個生產(chǎn)操作階段都有質(zhì)量程序文件。
4.0.3 Does factory conduct Pre-production meeting prior to start of production?
驗廠的工廠在生產(chǎn)前是否進(jìn)行產(chǎn)前會議?
4.0.4 (Critical) Are critical quality and safety checks reviewed, identified, and bs for improvement documented during Pre-production meeting?
(嚴(yán)重) 在產(chǎn)前會議中有沒有審查及確認(rèn)嚴(yán)重的質(zhì)量問題和安全問題并記錄采取的改進(jìn)行動?
4.0.5 Does factory conduct “pilot-run”, review product quality against specification sheet and document results with corrective bs prior to production?
驗廠的工廠是否進(jìn)行“試生產(chǎn)”,根據(jù)產(chǎn)品規(guī)格明細(xì)檢討產(chǎn)品質(zhì)量, 并記錄在生產(chǎn)前的糾正行動?
4.0.6 Was in house lab-testing perbed on current production? (Request for test copies)
當(dāng)前生產(chǎn)有沒有實施內(nèi)部實驗室測試?(要求測試記錄副本)
4.0.7 Does factory QC compare first piece samples with approval sample and specification sheet?
沃爾瑪驗廠咨詢輔導(dǎo)方案
驗廠咨詢輔導(dǎo)中心-深圳凱冠是專業(yè)從事沃爾瑪驗廠,針對中國工廠的社會責(zé)任驗廠,質(zhì)量體系驗廠,反恐驗廠等進(jìn)行的驗廠咨詢服務(wù)機(jī)構(gòu),目前已有數(shù)十家沃爾瑪。在中國大陸的供應(yīng)商經(jīng)過深圳凱冠咨詢師的輔導(dǎo)后通過沃爾瑪?shù)尿瀼S評估。
相信你們?nèi)绻俏譅柆數(shù)默F(xiàn)有供應(yīng)商或潛在供應(yīng)商,也將面對或即將按受此類的驗廠評估,如果驗廠不通過,所有沃爾瑪?shù)默F(xiàn)有訂單將被凍結(jié)或接不到新的訂單,所以,驗廠評估是目前企業(yè)生死存亡與發(fā)展的一個瓶頸,也是市場貿(mào)易的一個壁壘,如果你是一個高明的企業(yè)負(fù)責(zé)人,請你趕快與我們聯(lián)系,我們的首席和高級驗廠咨詢師都曾經(jīng)在SGS ITS BV CSCC等國際著名第三方評估公司工作過,對上述沃爾瑪驗廠標(biāo)準(zhǔn)及其它的COC驗廠要求非常精通,并且有數(shù)百家的驗廠咨詢經(jīng)驗,所以我們的驗廠咨詢服務(wù)將確保你順利的一次性通過沃爾瑪?shù)尿瀼S。