鏌存补姗�(j墨)闆欏惛娉礍鎾绺f煷娌规(j墨)闆欏惛娉礍鏌存补姗�(j墨)闆欏惛娉�12SH-6
楂旂⿳澶�锛屽叏閮ㄨ波鐗╅€氶亷(gu貌)鐗╂祦鐧�(f膩)璨紙閮ㄥ垎灏忎欢鐢�(ch菐n)鍝佸彲鑱�(li谩n)绯诲簵涓荤櫦(f膩)蹇仦锛岃Κ鍊戞敞鎰忓摝锛屽揩閬炶不(f猫i)鐢ㄥ彲涓嶄究瀹滃摝锛侊級鍥犲悇鐪佸煄甯備笉鍚�锛岀墿娴佽不(f猫i)鐢ㄤ笉鍚岋紝瀵�(sh铆)闅涜不(f猫i)鐢ㄤ互鐗╂祦閬�(y霉n)鍠偤涓�銆傦紙娉細璨ㄧ墿鐧�(f膩)鐗╂祦锛岄渶瑕埌鐣�(d膩ng)?sh霉)鍖氶敧闉搭倛鍜€绾︾宥濇礌銆傗敭铏绘敻c(di菐n)涓嶅悓鐗╂祦鍒拌波鏅�(sh铆)闁撲笉鍚�锛岃珛(q菒ng)瑕笉瑕佸お钁楁€�锛佽瑵璎濆悎浣�锛佺瑕臣(g貌u)鐗╂剦蹇�锛佺偤浜嗙瘈(ji茅)绱勪綘鎴戠殑鏅�(sh铆)闁�锛岃珛(q菒ng)鍏堢€忚鐢�(ch菐n)鍝佽┏绱�(x矛)瑾�(shu艒)鏄庡啀鑸囧鏈嶄簡瑙g浉闂�(gu膩n)鐢�(ch菐n)鍝佷俊鎭�銆傜敱浜庣敘(ch菐n)鍝佸瀷铏�(h脿o)澶锛屽彲鑳芥矑(m茅i)鏈夌従(xi脿n)璨�锛屽璩�(m脿i)瀹舵矑(m茅i)鏈夊湪绶�锛屽彲鎷嶅ソ淇濊瓑娆惧埌5-7澶╁収(n猫i)鐢熺敘(ch菐n)瀹屽伐锛涙媿鍓嶈珛(q菒ng)鑸囧鏈嶈伅(li谩n)绯伙紝濡傚鏈嶄笉鍦ㄧ窔锛屽喎鍗诲寰挵(hu谩n)姘存车鐐篠鍨嬫车鐐哄柈绱�(j铆)闆欏惛锛岃嚗寮忎腑闁�(k膩i)闆㈠績娉�锛岀啊(ji菐n)绋�(ch膿ng)闆欏惛娉典緵杓搁€佹竻姘村強鐗╃悊鍖栧(xu茅)鎬ц唱(zh矛)椤�(l猫i)浼间簬姘寸殑娑查珨锛屼粙璩�(zh矛)婧害80搴�锛岄仼鍚堝伐寤�锛屽煄甯�锛岀う灞�锛岄浕绔欑殑绲︽帓姘�锛岃静(n贸ng)鐢扮亴婧�銆�
S銆丼H鍠礆(j铆)闆欏惛涓枊(k膩i)寮忛洟蹇冩车鐢�(ch菐n)鍝佺壒榛�(di菐n)1銆佸瘑灏佺郴绲�(t菕ng)锛氬彲渚涢伕鐢ㄧ殑姗�(j墨)姊板瘑灏�銆佸~鏂欏瘑灏佸叾鍐峰嵒娼�(r霉n)婊戝潎閲囩敤鍏�(n猫i)寰挵(hu谩n)锛�2銆佹祦閲忓ぇ銆佹晥鐜囬珮锛氶洐鍚歌憠杓�锛屽叿鏈夋祦閲忓ぇ銆佹晥鐜囬珮绛夌壒榛�(di菐n)锛�3銆佸彲鏇存彌鐨勮桓濂楋細杌稿浣滅偤鏄撴悕浠讹紝璧峰埌淇濊(h霉)杌�锛屾彁楂樻车鐨勪娇鐢ㄥ=鍛�锛�4銆佸瘑灏佺挵(hu谩n)锛氬瘑灏佺挵(hu谩n)浣滅偤鏄撴悕浠�锛岃捣鍒版彁楂樻车鐨勬晥鐜囥€佸欢闀�(zh菐ng)娉电殑浣跨敤澹藉懡鐨勭壒榛�(di菐n)銆係銆丼H鍠礆(j铆)闆欏惛涓枊(k膩i)寮忛洟蹇冩车鐢�(ch菐n)鍝佺敤閫�
鏌存补姗�(j墨)闆欏惛娉礍鎾绺f煷娌规(j墨)闆欏惛娉礍鏌存补姗�(j墨)闆欏惛娉�12SH-6
When installed during the anti-rust guarantee period of the pump, it is not disassembly and washing. Cleaning should be removed when abnormal or exceeding the anti-rust guarantee period, and should meet the following requirements: The disassembly order of parts and components should be in accordance with the requirements of manufacturers; parts and components should be free of rust, often cleaned and qualified, their mating surface should be coated with a thin layer of lubricating oil; Pump leveling and search should be carried out according to the installation instructions provided by the manufacturer. The steam separator shall be installed in accordance with the following requirements: The installation level deviation is not greater than 1/1000, the pipe connected with the pump should not be too long, the flange bonding surface should be tight, the water inlet hole of the soda separator should be connected with the external water supply pipe, and the pipeline should be kept open. Pump commissioning should meet the following requirements: The car should be flexible, no block, vacuum control valve should be adjusted to the appropriate opening, pump filler function of the cooling pipe should be smooth, should be injected into the pump body water, the car rinse clean.
S銆丼H鍠礆(j铆)闆欏惛涓枊(k膩i)寮忛洟蹇冩车姒傝堪