国产精品久久久久久久久,四季AV一区二区夜夜嗨,日韩精品无码中文字幕电影,www.五月婷婷.com

產(chǎn)品簡介
德國品質(zhì)ABB-DPT63-CB010 C4 3P-雙電源開關(guān)
德國品質(zhì)ABB-DPT63-CB010 C4 3P-雙電源開關(guān)
產(chǎn)品價(jià)格:¥1
上架日期:2017-04-01 11:39:51
產(chǎn)地:中國大陸
發(fā)貨地:東莞市
供應(yīng)數(shù)量:不限
最少起訂:1件
瀏覽量:166
資料下載:點(diǎn)擊下載
其他下載:暫無相關(guān)下載
詳細(xì)說明
    雙電源自動(dòng)切換開關(guān)安全操作規(guī)程
      雙電源自動(dòng)切換開關(guān)(簡稱雙電源切換開關(guān))是采用塑殼斷路器或負(fù)荷開關(guān) 。雙電源自動(dòng)切換開關(guān)作為執(zhí)行元件,配以

    為核心的自動(dòng)控制器和帶機(jī)電聯(lián)鎖的控制機(jī)構(gòu),是一種性能完善、安全可靠、自動(dòng)化程度高、使用范圍廣的雙電源自動(dòng)轉(zhuǎn)換開關(guān)。
      雙電源自動(dòng)切換開關(guān)適用于交流50/60Hz、690V及以下,額定電流自6A至1250A及以下的兩路電源(常用電源N和備用電源或發(fā)電機(jī)電源R)的供電系統(tǒng)中,因一路電源發(fā)生故障(停電、欠壓、過壓、斷相、頻率偏移)而進(jìn)行電源之間的自動(dòng)切換,以保證供電的可靠性和安全性,實(shí)現(xiàn)無人值守連續(xù)供電。
      雙電源自動(dòng)切換開關(guān)安全操作規(guī)程步驟如下:
      1、當(dāng)因故停電,且在較短時(shí)間內(nèi)無法恢復(fù)供電時(shí),必須啟用備用電源。步驟:
      ①切除市電供電各斷路器(包括配電室控制柜各斷路器,雙電源切換箱市供電斷電器),拉開雙投防倒送開關(guān)至自備電源一側(cè),保持雙電源切換箱內(nèi)自備電供電斷路器處于斷開狀態(tài)。
      ②啟動(dòng)備用電源(柴油發(fā)電機(jī)組),待機(jī)組運(yùn)轉(zhuǎn)正常時(shí),順序閉合發(fā)電機(jī)空氣開關(guān)、自備電源控制柜內(nèi)各斷路器。
      ③逐個(gè)閉合電源切換箱內(nèi)各備用電源斷路器,向各負(fù)載送電。
      ④備用電源運(yùn)行期間,操作值班人員不得離開發(fā)電機(jī)組,并根據(jù)負(fù)荷的變化及時(shí)調(diào)整電壓、廠頻率等,發(fā)現(xiàn)異常及時(shí)處理。
      2、市電恢復(fù)供電時(shí),應(yīng)及時(shí)做好電源轉(zhuǎn)換工作,切斷備用電源,恢復(fù)市電供電。
      步驟:
      ①按順序逐個(gè)斷開自備電源各斷路器,順序是:雙電源切換箱自備電源斷路器→自備電源配電柜各斷路器→發(fā)電機(jī)總開關(guān)→將雙投開關(guān)撥至市電供電一側(cè)。
      ②按柴油機(jī)停機(jī)步驟停機(jī)。
      ③按順序,從市電供電總開關(guān)至各分路開關(guān)逐個(gè)閉合各斷路器,將雙電源切換箱自市電供電斷路器置于閉合位置。
      3、檢查各儀表及指示燈指示是否正常,啟動(dòng)變壓器內(nèi)冷卻風(fēng)扇

    Double power supply automatic switching switch           The utility model relates to a double power supply automatic switching switch, which is a double circuit power supply switch. Double power automatic switch as actuators, with automatic controller using MCU as the core and the mechanical interlock control mechanism is a dual power supply, perfect perbance, safe and reliable, high degree of automation, the use of a wide range of automatic conversion switch.           Double power automatic switch for AC 50/60Hz, rated current 690V and below, from 6A to 1250A and the following two power supply (common power supply N and standby power supply or power generator R) power supply system, due to a power failure (power failure, overvoltage, undervoltage, open phase and frequency offset) and automatic switching between power supply, to ensure the safety and reliability of power supply, power supply to achieve continuous unattended.           Double power supply automatic switch safety procedures are as follows:           1, when the power outage, and in a short period of time can not restore power supply, must enable the standby power supply. Step:           The removal of electric power supply of each circuit breaker (including the circuit breaker control cabinet, power distribution room dual power switch box power supply breaker), open the double throw switch to the prevention of back power supply side, keep the double power supply switching power supply box self breaker is in off state.           Start the standby power supply (diesel generator set), when the standby group is running normally, turn off the generator air switch and the circuit breaker in the control cabinet.           The power supply circuit breaker of each power supply is switched off by the power supply switch box.           During the operation of standby power supply, the operator on duty shall not leave the generator set, and adjust the voltage and the frequency of the plant in time according to the change of the load.           2, the city to restore power supply, should do a good job in a timely manner to power conversion, cut off the standby power supply, restore power supply.           Step:           The sequentially disconnect power supply of each circuit breaker, the order is: dual power supply switching power supply circuit breaker box, power distribution cabinet, each circuit breaker switch, the generator double throw switch to electric power supply side.           According to the diesel engine shutdown step down.           According to the order, the main switch of the power supply of the city is connected to each branch switch to close the circuit breakers one by one.           3, check the instrument and indicator light is normal, start the transber cooling fan.


在線詢盤/留言
  • 免責(zé)聲明:以上所展示的信息由企業(yè)自行提供,內(nèi)容的真實(shí)性、準(zhǔn)確性和合法性由發(fā)布企業(yè)負(fù)責(zé),本網(wǎng)對(duì)此不承擔(dān)任何保證責(zé)任。我們原則 上建議您選擇本網(wǎng)高級(jí)會(huì)員或VIP會(huì)員。
    企業(yè)信息
    東莞市恒軒機(jī)電有限公司
    會(huì)員級(jí)別:
    ------------ 聯(lián)系方式 ------------
    聯(lián)系人:陳麗(小姐)
    聯(lián)系電話:0769-33215709
    聯(lián)系手機(jī):13542323887
    傳真號(hào)碼:0769-22226323
    企業(yè)郵箱:1126267656@qq.com
    網(wǎng)址:H1126267656.jdzj.com
    郵編:523000
    推薦供應(yīng)
    0571-87774297